Comprehensive Shot Blasting for Structural Steelwork
Our structural steel frame shot blasting service delivers exceptional surface preparation for all types of building frames, roof trusses, and load-bearing...
Our Process
1. Structural Assessment
We inspect the steel frame components to determine appropriate blast media, pressure settings, and surface preparation r
2. Component Preparation
Frame sections are positioned for optimal blast coverage. Critical areas such as bolt holes and connection points are pr
3. Shot Blasting
Using appropriate blast media, we systematically clean all frame surfaces to achieve professional cleanliness for your c
4. Quality Inspection
We conduct thorough inspections to ensure all surfaces meet the required cleanliness and profile specifications.
Applications
Building frame structures
Roof trusses and purlins
Portal frame components
Mezzanine floor structures
Industrial building frames
Warehouse structural steelwork
What we need to know before we blast your structural steel
Send us the steelwork details, the condition it is in and what needs to happen after blasting. We’ll help turn that into a practical plan.
What should a structural steel blasting brief include?
Tell us which steelwork is included, what condition it is in, how we can get to it and what is happening next—whether that is primer, a coating system or galvanising. If you have a spec, send it over too. We will plan the blast work around the actual steel and site, not guess from a generic grade.
Can preparation and protective coating be coordinated?
Yes. At the HB Tunnelling warehouse in Doncaster, our five-person team carried out abrasive blasting, got primer on straight after and then applied intumescent fire-protective coating as one coordinated package. We will plan your sequence around your own spec and site set-up.
Before blasting: Mill scale, rust grade A–D, old primer, weld spatter, oil contamination
After blasting: Sa 2.5 or Sa 3 cleanliness; 40–75 µm anchor profile for coating adhesion
Industries We Serve
Structural steel fabricators
Main contractors
Steelwork erectors
Building developers
When to Choose Shot Blasting
Shot blasting is required before hot-dip galvanising and before intumescent fire protection coatings. Wire brushing or power tool cleaning cannot achieve the anchor profile needed for long-term coating adhesion on structural steelwork.
End-to-end blasting and intumescent coating project evidence
See how a five-person specialist team delivered abrasive blasting, immediate primer protection and intumescent fire-protective painting as one coordinated scope for the HB Tunnelling Doncaster warehouse refurbishment.
Keeping surface preparation and fire protection together reduced handovers between trades and supported continuous progress through the refurbishment programme.
Yes, we provide mobile shot blasting services and can work at your premises. For components requiring galvanizing, we ensure complete coverage and professional cleanliness for protective treatments. We coordinate timing
How long does the process take?
Timeline depends on the size and complexity of the frame structure. A typical portal frame bay can be processed in 2-3 days. We can provide a detailed timeline after assessing your specific requirements.
Where We Offer Structural Steel Frames
Our mobile units deliver structural steel frames services across 35 counties in the UK. Select a county to see all the towns and areas we cover.